7397 Seneca Street, East Aurora NY 14052 Ph: (716) 674-0883 Fx: (716) 674-0884 GCallahan@demcoinc.com
Projects Home
Westinghouse Demolition of Powerhouse 284F

  • DEMCO, Inc. successfully performed the D&D of two 3,000 ton steel boilers, from within a secured area. This project also required DEMCO to remove over 3,000 linear feet of asbestos containing pipe lagging and 4,000 square feet of ACM Magnesium block. In addition, DEMCO utilized its approved rigging plan to remove, for reuse, two 2,000 hp cooling tower pumps and numerous diesel generators.