* Removal of all hazardous materials from casino barge to eliminate any potential for contamination of water.
* Trabidity screen and oil boom were placed around the entire barge to prevent any contamination of water.
* HVAC and restaurant equipment were salvaged from the casino barge, prior to demolition.
* Coordination of all barges, boats, tugs and salvage vessels to safely and efficiently compete the floating casino demolition.
* All work was safely performed utilizing a PC1000, which was floated on a remote barge.